[newdevjobsindo] REQUEST FOR PROPOSAL - CONTRACTOR FOR COMPOSTING UNIT ESTABLISHMENT PROJECT TRACTION

SNV
SNV is a global development partner, deeply rooted in the countries where we operate. We are driven by a vision of a better world: A world where across every society all people live with dignity and have equitable opportunities to thrive sustainably. To make this vision a reality, we need transformations in vital agri-food, energy, and water systems. SNV contributes by strengthening capacities and catalysing partnerships in these sectors. We help strengthen institutions and effective governance, reduce gender inequalities and barriers to social inclusion, and enable adaptation and mitigation to the climate and biodiversity crises.
Building on 60 years of experience we support our partners with our technical and process expertise and methodological rigour. We do this in more than 20 countries in Africa and Asia with a team of approximately 1,600 colleagues. By being adaptable and tailoring our approaches to these different contexts, we can contribute to impact at scale, resulting in more equitable lives for all.
Traceable and Sustainable Palm Oil Supply Chain (TARCTION) Project
The Project's purpose is to implement supportive on-field actions while verifying the No Deforestation No Peat No Exploitation (NDPE) compliance of the project, in line with L'ORÉAL 2030 Forest Policy, ensuring traceability to the producers and implementing yearly reporting of its impact. Overall finality of the Project is to establish a sustainable supply-chain of palm oil acting as a lever of development for the Beneficiaries and aligned with L'ORÉAL sustainable sourcing criteria available.
The strategic partnership is established to implement innovative ways to
  1. Support the growth of sustainable oil palm production in Jambi
  2. To promote the inclusion of independent smallholders in global palm oil market, considering the upcoming EU Deforestation-free regulation entering into force end of 2024; and
  3. To support the growth of regenerative agriculture in oil palm to restore the soils.
The Project Traction (L'Oréal) is a project focused on implementing regenerative agriculture concepts aimed at encouraging farmers to practice a balanced approach between chemical and organic farming. This allows the soil and microorganisms within it to break down nutrients (fertilizers) that are absorbed by the plants, thereby reducing the excessive use of chemical fertilizers.
Through this regenerative agriculture training, a fertilizer unit (composting unit) will be established in the village to support the availability of soil-amendment fertilizers, ensuring healthier soil conditions and increasing palm oil production. In this regard, SNV through the TRACTION project, intends to appoint a contractor to construct a composting unit building.
Deliverable
One compost processing unit based on the design and analysis of civil engineering consultant (the detailed design will be sent to the selected contractor).
Scope of Work
The contractor should:
  1. Build the compost processing unit referring to the needs of the project.
  2. Build the compost processing unit following the BoQ designed and analyzed by the civil engineering consultant.
  3. Finish the construction based on the agreed timeline.
  4. Provide supporting tools for the compost unit, according to the list in the budget.
Unit Specification
  1. Width area: 500M2 (25m X 20m)
  2. Capacity of production: 35 – 45 ton/month
  3. Construction Unit:
  • Fermentation Areas (4th Plot with capacity 7,5 – 10 Ton/plot)
  • Warehouse
  • Processing room
  • Office
  • 2 Toilet
  • Kitchen
  • Mushola
Reporting Line
The consultant will report to Project Manager TRACTION, Project Field Officer, and IBD Advisor.
Period
Construction work will begin immediately after the selected vendor is selected. The implementation target is divided into two phases, with the estimated completion times as follows:
Phase I (maximum first 6 months): Completion of the fermentation area and processing room.
Phase II (maximum next 6 months): Completion of the warehouse, office, two restrooms, kitchen, and prayer room.
How to Apply
Registration and aanwijzing information can be accessed via the link below:
1. Construction Services Auction Information: https://bit.ly/LelangKonstruksiTRACTION
2. Aanwijzing registration info (Monday, July 21, 2025): https://bit.ly/DaftarAanwijzingTRACTION

Best Regards,
Zakharia Sabatian 
SNV Netherlands Development Organisation
Graha Inti Fauzi Building 
Jalan Hj. Tutty Alawiyah No. 22, 5th Floor | Pejaten Barat, Pasar Minggu, Jakarta Selatan 12510 | Indonesia 
zsabatian@snv.org | www.snv.org | +62 (0)21 7918 6988 
DISCLAIMER: This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. Any views or opinions presented in this email are solely those of the author and do not necessarily represent those of SNV. SNV accepts no liability for any damage caused by any virus transmitted by this email.